logo

POWER VI

Sector: Water Supply and Storage • Location: Peru

Source: World Bank Group

Project
Closed

The Sixth Power Project is designed to: (i) strengthen the major institutions in the power sector by supporting management and financial reforms; (ii) assist in the financing of investment needed to expand production and distribution of electricity; and (iii) support the carrying out of priority engineering studies. The project will be executed by three institutions: ELECTROLIMA, ELECTROPERU, AND

Project Information FAQ

Project Information

5 Q
The project “POWER VI” is an infrastructure initiative in the Water Supply and Storage sector, located in Peru. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Sixth Power Project is designed to: (i) strengthen the major institutions in the power sector by supporting management and financial reforms; (ii) assist in the financing of investment needed to expand production and distribution of electricity; and (iii) support the carrying out of priority engineering studies. The project will be executed by three institutions: ELECTROLIMA, ELECTROPERU, AND HIDRANDINA. ELECTROLIMA will be responsible for the largest component of the project comprising the 1982-1986 expansion plan for its distribution system, construction of the Yuracmayo dam, three engineering studies and a training program. ELECTROPERU will carry out engineering related to the preparation of the Mantaro transfer project, will receive technical assistance in financial management and will carry out a training program. The HIDRANDINA component will consist of engineering related to preparation of the high-priority Mayush hydroelectric project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data