POWER VII
Sector: Power Generation (CCGT) • Location: El Salvador
Source: World Bank Group
The project consists of: (a) supply and installation of the third unit (about 30 MW) at the Ahuachapan geothermal plant; (b) construction of about 39 circuit-km of new 115 kV transmission lines; (c) conversion of about 83 circuit-km of existing 69 kV transmission lines of 115 kV; (d) construction of about 20 circuit-km of 46 kV subtransmission lines; (e) construction and / or improvement of 10 sub
- Status
- Closed
- Sector
- Power Generation (CCGT), Geothermal, Government
- Location
- El Salvador
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER VII
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of: (a) supply and installation of the third unit (about 30 MW) at the Ahuachapan geothermal plant; (b) construction of about 39 circuit-km of new 115 kV transmission lines; (c) conversion of about 83 circuit-km of existing 69 kV transmission lines of 115 kV; (d) construction of about 20 circuit-km of 46 kV subtransmission lines; (e) construction and / or improvement of 10 substations, including the addition of about 150 MVA to the system; (f) improvements and additions to CEL's communication and control system; (g) studies of other geothermal fields; and (h) about 500 man-months of consultants' services for tariff studies, geothermal studies, and detailed engineering and supervision of construction. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | El Salvador |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
