POWER VII
Sector: Power Generation (CCGT) • Location: Indonesia
Source: World Bank Group
The objective of the project is to enable PLN to meet the increase in load forecast for Java by 1982/83 by adding 200 MW to its generating capacity. The project provides for the construction of a third oil-fired thermal power unit (200 MW) at the Samarang Harbour in Central Java and associated transmission lines/substations, consultants' services and studies. No special risk of any significance is
- Status
- Closed
- Sector
- Power Generation (CCGT), Oil and Gas, Seaport, Geothermal, Government
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER VII
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the project is to enable PLN to meet the increase in load forecast for Java by 1982/83 by adding 200 MW to its generating capacity. The project provides for the construction of a third oil-fired thermal power unit (200 MW) at the Samarang Harbour in Central Java and associated transmission lines/substations, consultants' services and studies. No special risk of any significance is expected in the construction of the project. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Indonesia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Oil and Gas, Seaport, Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
