POWER-WAPDA II
Sector: Water Supply and Storage • Location: Pakistan
Source: World Bank Group
Project components include expansion of WAPDA's power transmission facilities by construction of approximately 336 miles of a 500 kV single circuit transmission line between Lyallpur, Multan and Guddau, to be operated initially at 220 kV; installationof a 220 kV switching station at Multan and of a transformer repair bay at Lyallpur; engineering and supervision services; training in 500 kV system
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Government
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER-WAPDA II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project components include expansion of WAPDA's power transmission facilities by construction of approximately 336 miles of a 500 kV single circuit transmission line between Lyallpur, Multan and Guddau, to be operated initially at 220 kV; installationof a 220 kV switching station at Multan and of a transformer repair bay at Lyallpur; engineering and supervision services; training in 500 kV system operation; and accounting and management consulting services. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Pakistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
