POWER XI
Sector: Nuclear • Location: Mexico
Source: World Bank Group
The total cost of the 1972-74 investment program is estimated at the equivalent of $1,368 million with a foreign exchange cost of $650 million. Of the total some 60 percent is for generation, transmission and substations, 23 percent for distribution, 6 percent for village electrification, 8 percent for overhead and 3 percent for frequency unification, consultants and miscellaneous. Major generatio
- Status
- Closed
- Sector
- Nuclear, Power Generation (CCGT), Wind, Geothermal, Government
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER XI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The total cost of the 1972-74 investment program is estimated at the equivalent of $1,368 million with a foreign exchange cost of $650 million. Of the total some 60 percent is for generation, transmission and substations, 23 percent for distribution, 6 percent for village electrification, 8 percent for overhead and 3 percent for frequency unification, consultants and miscellaneous. Major generation equipment includes 3,015 MW of hydroplant, 3,900 MW of steam-turbine plant, 670 MW of nuclear plant and 500 MW of gas-turbine plant. The transmission program envisages the construction of 3,000 km of 400 kV lines, 2,900 km of 220 kV lines and 5,600 km of 69-161 kV lines; furthermore, 17,000 MVA of main stations and 300 MVA of small substations will be constructed. The distribution networks, including village electrification, will be expanded at an annual cost of $120 million. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Mexico |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Nuclear, Power Generation (CCGT), Wind, Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Nuclear projects in Mexico
- Agua Prieta II Integrated Solar Combined Cycle Power Plant Sonora
- Dr Reddy’s Cuernavaca Manufacturing Facility
- HSBC Central Bank Mandatory Reserves Coverage
- Energie Los Cabos
- Delicias Solar solar H2 project
- Yucatan Grid Upgrade
- Implementation of Mexico NAMA in the new construction sector - BMU financing
- CFE Combined Cycle Plants Expansion