logo

POWER XIV

Sector: Power Generation (CCGT) • Location: Indonesia

Source: World Bank Group

Project
Closed

The Fourteenth Power Project supports the twin objectives of the expansion of power supply facilities in Indonesia to met the demand and the development of alternate sources in the energy sector. It includes the construction of two 400 MW coal-fired units at the Suralaya steam power plant in West Java, and expansion of the distribution facilities in East and Central Java and in the Jabotabek area

Project Information FAQ

Project Information

5 Q
The project “POWER XIV” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Fourteenth Power Project supports the twin objectives of the expansion of power supply facilities in Indonesia to met the demand and the development of alternate sources in the energy sector. It includes the construction of two 400 MW coal-fired units at the Suralaya steam power plant in West Java, and expansion of the distribution facilities in East and Central Java and in the Jabotabek area. About 400,000 residential consumers in urban and rural areas will benefit from this supply. Simultaneously, the project will address the institutional development needs of PLN. Consulting services for hydropower and transmission development are also included. Possible risks include the risk of delay in the Suralaya project due to a delay in finalizing the critical steam generator contract or constraints on local funds. Suitable agreements have been reached with the government and PLN to reduce these risks. There is no unusual risk associated with the distribution component of the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data