POWER
Sector: Power Generation (CCGT) • Location: Tanzania
Source: World Bank Group
The proposed project forms part of an interim expansion program during the years 1968 through 1970 which will provide TANESCO with additional facilities to help meet the demand for power until the next major generating station can be commissioned. The project provides some 21 megawatts of diesel generating plant in Dar es Salaam and Mwanza, minor extensions to generating plant in isolated areas, a
- Status
- Closed
- Sector
- Power Generation (CCGT), Geothermal, Government
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project forms part of an interim expansion program during the years 1968 through 1970 which will provide TANESCO with additional facilities to help meet the demand for power until the next major generating station can be commissioned. The project provides some 21 megawatts of diesel generating plant in Dar es Salaam and Mwanza, minor extensions to generating plant in isolated areas, and related extensions to transmission lines and distribution networks. There is no alternative method of meeting the load growth more economically until a major hydroelectric installation can be commissioned. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Tanzania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Tanzania
- Open for FDI through a minority stake/Development of a new project/Processing and preserving of fish and fish products/BLUE PROCESSING COMPANY .LTD
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of made-up textile articles, except apparel/GSM FOAM CO LTD
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of other food products/ZANZIBAR ORGANIC PRODUCER(ZANOP)
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of plastics products/Jafnob Printing and Packaging Ltd
- Open for FDI through a minority stake/Establishment of storage or distribution/sales outlet/Manufacture of soap and detergents, cleaning and polishing preparations, perfumes and toilet preparations/MSICHOKE CO-OPERATIVE SOCIETY
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of bakery products/FAUZ GROPU ENTREPRISES
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of other food products/NGWALI INVESTMENT LIMITED COMPANY
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of basic iron and steel/Quaim Steel Mills Ltd
