POWER
Closed · Syrian Arab Republic
Source: World Bank Group
The Mehardeh Power Project includes: (i) construction of the first 125-MW stage of a steam-electric power station at Mehardeh; (ii) construction of four new 230-kV substations and expansion of four existing substations; (iii) training for EPE staff in management and engineering; and (iv) engineering and management consulting services.
- Status
- Closed
- Sector
- Power Generation (CCGT), Geothermal, Government
- Location
- Syrian Arab Republic
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Mehardeh Power Project includes: (i) construction of the first 125-MW stage of a steam-electric power station at Mehardeh; (ii) construction of four new 230-kV substations and expansion of four existing substations; (iii) training for EPE staff in management and engineering; and (iv) engineering and management consulting services. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Syrian Arab Republic |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
