POWER
One of 1,061 projects Taiyo tracks in Sierra Leone.
Source: World Bank Group
The King Tom Power Station and Distribution Program Project in Sierra Leone will finance the foreign exchange cost of a power expansion program in the capital city of Freetown. This project consist of the construction of a new generating station at King Tom Point in Freetown and the expansion of distribution facilities. The generating station will be equipped with two 6,600 kw slow speed diesel en
- Status
- Closed
- Sector
- Power Generation (CCGT), Geothermal, Commercial, Government
- Location
- Sierra Leone
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The King Tom Power Station and Distribution Program Project in Sierra Leone will finance the foreign exchange cost of a power expansion program in the capital city of Freetown. This project consist of the construction of a new generating station at King Tom Point in Freetown and the expansion of distribution facilities. The generating station will be equipped with two 6,600 kw slow speed diesel engines coupled to generators to produce power at 11,000 volts, switchgear storage tanks, and ancillary works. The building and foundation will be built to provide for the installation of a third unit. This plan will take into account the estimated increase in generating capacity and load demand, the provision of power to an increasing portion of the population and the growth of the area to be supplied. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Sierra Leone |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
