POWER
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Power Project in Mauritius will provide contributions to the power expansion program of the Central Electricity Board (CEB). The Fort Victoria diesel power station will have an initial installed capacity of 12 MW and the plant site will permit eventual expansion of the station up to 40 MW. The expansion of transmission and distribution facilities will include about 12 miles of 66 KV transmissi
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Government
- Location
- Mauritius
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Power Project in Mauritius will provide contributions to the power expansion program of the Central Electricity Board (CEB). The Fort Victoria diesel power station will have an initial installed capacity of 12 MW and the plant site will permit eventual expansion of the station up to 40 MW. The expansion of transmission and distribution facilities will include about 12 miles of 66 KV transmission lines, the addition of substations, the extension of distribution facilities to housing projects and the reconstruction and extension of low voltage networks. The increasing power load and limited water available during the dry season during a severe drought, afford a need for additional power which will be provided by the Fort Victoria station. The project will meet the growing demand for electric power on the island, as well as rehabilitate and expand CEB's transmission and distribution system. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Mauritius |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
