POWER
Sector: Power Generation (CCGT) • Location: Malaysia
Source: World Bank Group
The project consists of the first stage of a new thermal station at Port Dickson with a capacity of 120 MW, the second stage of the thermal station at Johore Bahru with a capacity of 60 MW, the installation of additional generating units in the Woh and Odak Hydroelectric Power Stations aggregating 51.4 MW, and the provision of transmission facilities. The total cost of the project, including inter
- Status
- Closed
- Sector
- Power Generation (CCGT), Geothermal, Government
- Location
- Malaysia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the first stage of a new thermal station at Port Dickson with a capacity of 120 MW, the second stage of the thermal station at Johore Bahru with a capacity of 60 MW, the installation of additional generating units in the Woh and Odak Hydroelectric Power Stations aggregating 51.4 MW, and the provision of transmission facilities. The total cost of the project, including interest during construction, is US$51.1 million. The proposed bank loan of US$37 million covers the foreign exchange cost. Purchase of all major items of imported equipment and the awarding of major construction contracts will be on the basis of international competitive bidding. The local currency costs of the project, together with other capital expenditures under NEB's program will be met from NEB's own resources and additional equity contributions by the Government. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Malaysia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project