POWER
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Wadi Hadramawt Electrification Project will provide an impetus to agricultural development in Wadi Hadramout by electrifying all irrigation water pumping in the Wadi through the erection of a 16-MW diesel generating plant and the construction of about 1,000 km of related transmission and distribution networks. The plant will replace the four inadequate existing power facilities and by using le
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Oil and Gas, Geothermal, Commercial, Raw Materials, Government
- Location
- Yemen
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Wadi Hadramawt Electrification Project will provide an impetus to agricultural development in Wadi Hadramout by electrifying all irrigation water pumping in the Wadi through the erection of a 16-MW diesel generating plant and the construction of about 1,000 km of related transmission and distribution networks. The plant will replace the four inadequate existing power facilities and by using less-expensive heavy grade oil will provide significant savings in fuel costs. As the first stage of an electrification scheme, it will also supply power for the first time to many of the major population centers, reaching by 1983 about 80,000 consumers or about 40 percent of the total population in the Wadi, and to small industrial consumers. Institution building objectives will be achieved through technical assistance comprising training abroad of PCEP's personnel, and consultants' services for a tariff study, and a power development study. The project faces no special risks but implementation delays could result because of the remoteness of the project site and its generally low level of development. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Yemen |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Oil and Gas, Geothermal, Commercial, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Yemen, Republic of
- ADEN PORT REHABILITATION
- RY-RURAL WATER SUPPLY ADD. FINANCING
- Yemen Integrated Urban Services Emergency Project
- Additional Financing for Third Social Fund for Development Project
- TIHAMA DEVT SUPPLEMENT
- Yemen: Pilot Program for Climate Resilience Phase I (PPCR I)
- RY-TAIZ WATER SUPPLY PILOT
- Yemen Emergency Human Capital Project
