The project will be part of EAC's 1967-1971 expansion program, which envisages the installation of additional capacity to meet increased demand and the extension of its transmission and distribution system so that it will virtually embrace the entire island by 1971. Under the project a third generating unit with auxiliary equipment, identical to that now in operation, will be installed at the Moni

Status
Closed
Sector
Power Generation (CCGT), Waste Processing and Treatment, Geothermal, Government
Location
Cyprus
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER/DESALINATION

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER/DESALINATION” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Cyprus. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will be part of EAC's 1967-1971 expansion program, which envisages the installation of additional capacity to meet increased demand and the extension of its transmission and distribution system so that it will virtually embrace the entire island by 1971. Under the project a third generating unit with auxiliary equipment, identical to that now in operation, will be installed at the Moni Power station. The further program, not part of the Bank-financed project, includes the extension of the transmission system by a double-circuit 66-KV overhead line from Moni to Limassol, a distance of 16 miles, and the installation of two 66-KV substations with auxiliary equipment. The distribution system will be enlarged by 509 miles of 11-KV underground cables and overhead lines, by some 500 miles of low voltage mains and by 460 transformers with a total capacity of 60,000 KVA.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Cyprus

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Waste Processing and Treatment, Geothermal, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project