logo

Powergen Uppudaluwa Wind Farm

Active · Puttalam

Source: World Bank Group

Project
Active

Orient Green Power, a subsidiary of Shriram Group from Chennai, India, was planning the development of the 10.5 MW wind farm in Puttalam, Sri Lanka. Orient Green Power owned 90% of the company Powergen Lanka (Pvt) Ltd, responsible for executing the project. In July 2012, Orient Green Power divested its 90% share in the company to Windforce Private Limited, from Colombo Sri Lanka. The project was l

Status
Prospective
Sector
Wind, Power Generation (CCGT), Raw Materials, Commercial, Government
Location
Puttalam, Sri Lanka
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Powergen Uppudaluwa Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Powergen Uppudaluwa Wind Farm” is an infrastructure initiative in the Wind sector, located in Puttalam, Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Orient Green Power, a subsidiary of Shriram Group from Chennai, India, was planning the development of the 10.5 MW wind farm in Puttalam, Sri Lanka. Orient Green Power owned 90% of the company Powergen Lanka (Pvt) Ltd, responsible for executing the project. In July 2012, Orient Green Power divested its 90% share in the company to Windforce Private Limited, from Colombo Sri Lanka. The project was located in Uppudaluwa, Kalpitiya. Output was expected to be 26.28 GWh annually. The project held a PPA with Ceylon Electricity Board (CEB), for a period of 20 years at a price of `10 per KWH (US$0.08). Typical here is that RE is not subsidized, and the project is selling at market price. The wind farm was reported as operational in July 2012, but no further reference to commissioning years, or financial closure dates were available. Assumed here is January 2012. The project consisted of 7 x 1.5 Mw LTW 77-1.5 Leitner Shriram Wind Turbines. An agreement with the Board of Investment (BOI) was signed in August 2010. Construction was expected to start in September 2010. Commissioning was initially expected for June 2011. Total cost was estimated at 80 crore, around US$14 million. The equity transfer in 2012 happend at a cost of US$8 million. http://cdm.unfccc.int/Projects/Validation/DB/934LY1JVHWY6OMU01FNJGDTLI5YE2G/view.html http://www.windpower.lk/project3.php SeeNews Renewables, Orient Grien Power sheds 90% in Sri Lankan PowerGen, 25 July 2012

Original sector

Energy

Budget

Location

Country

Sri Lanka

State

Puttalam

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Power Generation (CCGT), Raw Materials, Commercial, Government

Article published date

2024-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project