PowerGrid Solar Power Transmission Project
The owner, status and timeline of this project. A free account opens every field.
Source: Manufacturing Today India
The project strengthens transmission infrastructure to capture 8.1 GW of solar power from renewable energy zones in Rajasthan. It was fully commissioned on 19 December 2024 and received its commercial operation notification on 22 January 2025.
- Status
- Closed
- Sector
- Solar, Commercial, Manufacturing (Industrial), Power Generation (CCGT)
- Location
- Rajasthan, India
- Updated
- 22 Jul 2026
- Source
- Manufacturing Today India
ConstructChat
Ask ConstructChat about PowerGrid Solar Power Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project strengthens transmission infrastructure to capture 8.1 GW of solar power from renewable energy zones in Rajasthan. It was fully commissioned on 19 December 2024 and received its commercial operation notification on 22 January 2025. |
Original sector | Energy |
Location
Country | India |
State | Rajasthan |
Source
Source | Manufacturing Today India |
URL |
More Details
Record type | Project |
Sector | Solar, Commercial, Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2025-01-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
