Powerhouse 95 Data Center Campus Master Report
Sector: Steel • Location: Fredericksburg, Virginia, United States of America
Source: Dodge
Up to 8 data centers over 145 acres - PowerHouse 95 will have three 300MW substations, with the first currently under development and expected to provide 150MW by October 2025. The campus will total up to 800MW across three substations, and see a maximum of eight three-story buildings built, totaling 3.5 million square feet
- Status
- Prospective
- Sector
- Steel, Commercial, Data Center
- Location
- Fredericksburg, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Powerhouse 95 Data Center Campus Master Report
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Up to 8 data centers over 145 acres - PowerHouse 95 will have three 300MW substations, with the first currently under development and expected to provide 150MW by October 2025. The campus will total up to 800MW across three substations, and see a maximum of eight three-story buildings built, totaling 3.5 million square feet |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Fredericksburg |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Commercial, Data Center |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
