logo

Powerhouse Louisville Data Center 400MW

Sector: Road • Location: Louisville, Kentucky, United States of America

Source: Dodge

Project
Construction Documents

Build a data center campus in Louisville that will use about 400 megawatts of electricity with 130 megawatts of electricity expected to be used in 2026 when the center becomes operational. Project will construct 7 buildings along Camp Ground Road between Kramers and Lees Lanes. The 150-acre site will be Louisville s first large-scale data center with the aim of courting tech giants like Google, Am

Status
Closed
Sector
Road, Data Center, Power Generation (CCGT), Commercial
Location
Louisville, Kentucky, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Powerhouse Louisville Data Center 400MW

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Powerhouse Louisville Data Center 400MW” is an infrastructure initiative in the Road sector, located in Louisville, Kentucky, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

construction documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Build a data center campus in Louisville that will use about 400 megawatts of electricity with 130 megawatts of electricity expected to be used in 2026 when the center becomes operational. Project will construct 7 buildings along Camp Ground Road between Kramers and Lees Lanes. The 150-acre site will be Louisville s first large-scale data center with the aim of courting tech giants like Google, Amazon and Microsoft. At the time, officials said they were already in talks with several well-know...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Kentucky

City

Louisville

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Data Center, Power Generation (CCGT), Commercial

Article published date

2025-08-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project