PowerLinks Transmission Ltd

Sector: Hydro • Location: India

Source: World Bank Group

Project
Active

PowerLinks Transmission Ltd (Powerlinks), a joint venture between private utility Tata Power Company (TPC) and the Government of India owned Power Grid Corporation of India Ltd (PGCIL), was established to implement the Tala Transmission Project (TTP) on a build-own-operate-transfer basis (BOOT) for 30 years. Tala Transmission Project involved installation of 1200 km transmission line from Siliguri

Project Information FAQ

Project Information

4 Q
The project “PowerLinks Transmission Ltd” is an infrastructure initiative in the Hydro sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

PowerLinks Transmission Ltd (Powerlinks), a joint venture between private utility Tata Power Company (TPC) and the Government of India owned Power Grid Corporation of India Ltd (PGCIL), was established to implement the Tala Transmission Project (TTP) on a build-own-operate-transfer basis (BOOT) for 30 years. Tala Transmission Project involved installation of 1200 km transmission line from Siliguri, in West Bengal, to Mandaula, near New Delhi and the operation and maintenance of the transmission line for 30 years. The transmission line was built to transport power from the Tala hydroelectric plant in Bhutan to New Delhi, India and to carry surplus power from the eastern grid of India to the power deficit Northern grid. Tata Power Company Limited was selected to partner with PGCIL in TTP in December, 2001 through an international bidding process. Tata Power has a majority stake of 51% in Powerlinks and the balance is held by PGCIL. The only other pre-qualified bidder who participated in the TTP tender was National Grid of UK. Powerlinks achieved financial closure for TTP in January, 2004 for an estimated investment of Rs 1,220 crore (US$ 269 million). The debt equity ratio was 70:30 and the lenders financed 70 percent of the estimated project cost in the form of a non-recourse term loan. The lenders comprised of State Bank of India (US$ 35.3 million), Infrastructure Development Finance Corporation (US$ 39.7 million), and International Finance Corporation (US$ 75 million). IFC’s loan had a maturity of 15 years and was denominated in Indian Rupees. The revenues for the project came from the transmission tariffs paid by Power Grid, which in turn collected it from the state electricity boards. The tariffs were regulated and calculated on a formula of cost base plus 16 percent return on equity plus 10 percent majoration factor. The project construction was completed in September 2006. http://www.powerlinkstransmission.com/ Have to check the capacity type - the news releases say 3000 MW. I think it should be MWH. http://ifcln001.worldbank.org/IFCExt/spiwebsite1.nsf/0/962aaa682c245b9385256d3900822cf9?OpenDocument

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data