PowerPlus Energy Battery Module Expansion
The owner, status and timeline of this project. A free account opens every field.
Source: Discovery Alert
PowerPlus Energy in Victoria was awarded AU$2.3 million to support plans to triple annual battery module production capacity to 150 MWh by 2026-27 under the Battery Breakthrough Initiative.
- Status
- Prospective
- Sector
- Stadium, Energy Storage, Manufacturing (Industrial)
- Location
- Victoria, Australia
- Updated
- 22 Jul 2026
- Source
- Discovery Alert
ConstructChat
Ask ConstructChat about PowerPlus Energy Battery Module Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | funded (before programme closure) |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | PowerPlus Energy in Victoria was awarded AU$2.3 million to support plans to triple annual battery module production capacity to 150 MWh by 2026-27 under the Battery Breakthrough Initiative. |
Original sector | Energy |
Budget |
Location
Country | Australia |
State | Victoria |
Source
Source | Discovery Alert |
URL |
More Details
Record type | Project |
Sector | Stadium, Energy Storage, Manufacturing (Industrial) |
Article published date | 2026-05-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Stadium projects in Australia
- Kidston solar project Queensland Australia
- Central West NSW Energy Zone Detailed Scoping Study
- Goulburn Bioenergy Project
- Ausgrid Power2U Project
- Thermal Evaporation of High Efficiency Solar Cells
- Cost Effective Gallium Arsenide Phosphide Top Solar Cell
- Energy Cost Study for Bombora Wave Energy Converter
- Relectrify Second-Life Battery Trial
