Poyrazgolu Wind Power Plant
Sector: Commercial • Location: Sinop, Turkey
Source: World Bank Group
Poyrazgolu Wind Power Project entailed the development and construction of a 30 MW onshore wind power plant in Sinop, Turkey. It comprised 15 Enercon turbines, each with 2MW capacity. The power plant was capable of powering 32,000 homes by producing 77 million kWh of electricity annually. The wind farm would reduce 77,000 ton carbon dioxide emission per year.
Poyrazgolu Wind Power Plant was devel
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Poyrazgolu Wind Power Project entailed the development and construction of a 30 MW onshore wind power plant in Sinop, Turkey. It comprised 15 Enercon turbines, each with 2MW capacity. The power plant was capable of powering 32,000 homes by producing 77 million kWh of electricity annually. The wind farm would reduce 77,000 ton carbon dioxide emission per year. Poyrazgolu Wind Power Plant was developed by a joint venture of three local companies – Ortadogu Enerji, Demirer Holding and Yesil Enerji. The total cost of the wind farm was estimated at USD 61 million. The project reached financial closure in November 2014 with USD 47 million as debt and the balance USD 14 million as equity from the three sponsors. Construction began in 2012 and commercial operations was targeted for end of 2014. Turkey’s national transmission company is required to provide grid connections to all renewable power projects. Wind developers in Turkey are qualified for a fixed feed-in tariff or they can sell the electricity generated on the free market and achieve a higher return than would be available with the fixed tariff. http://ortadoguenerji.com.tr/en/projelerimiz-ve-santrallerimiz/proje-ve-lisans-haritasi/poyraz-golu-ruzgar-santral-projesi-3/# |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
