logo
ProjectActive

PPC Barnet DRC

One of 572 projects Taiyo tracks in Congo, Democratic Republic of.

Source: International Finance Corporation (IFC)

PPC Ltd (PPC) jointly with the Barnet Group S.P.R.L is setting up a company to develop the greenfield Songololo Cement Project in the Cataractes District, Bas-Congo Province (the project to be partly financed by IFC), to produce about 3600 tons of cement per day based on 3000 tons of clinker per day. The project is located between the villages of Zamba and Malanga on a provincial road (RP 111), ap

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Road, Manufacturing (Industrial), Residential, Commercial, Government
Location
Democratic Republic of the Congo
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about PPC Barnet DRC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PPC Barnet DRC” is an infrastructure initiative in the Water Supply and Storage sector, located in Congo, Democratic Republic of. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

PPC Ltd (PPC) jointly with the Barnet Group S.P.R.L is setting up a company to develop the greenfield Songololo Cement Project in the Cataractes District, Bas-Congo Province (the project to be partly financed by IFC), to produce about 3600 tons of cement per day based on 3000 tons of clinker per day. The project is located between the villages of Zamba and Malanga on a provincial road (RP 111), approximately 8 km from the main Kinshasa-Matadi highway (RN 1), 220km west of Kinshasa, 20 km west of the town of Kimpese and 37 km to the east of the town of Songololo. Based on the Barnet Group’s exploitation rights for the mining area (No. 7649), PPC plans to establish a quarry and processing operation capable of producing up to 1.25 million tons of cement per year. Limestone, clay and laterite will be mined, crushed and mixed with sand to produce clinker, which will then be milled with limestone and (imported) gypsum to produce cement. The expected life of the mine is at least 30 years, and open-pit mining will take place to a depth of 70 m. A coal-fired kiln will be used to produce the clinker, and a 220 kV power line will run approximately 13 km from the Kwilu substation on the Inga-Kinshasa line to the plant for additional energy needs. In accordance with IFC’s Performance Standards, the power line is considered an associated facility, and further information on the approach to this activity is described in the paragraphs that follow. Ground cement will be stored in 7500-ton silos, and the processing plant will have the capacity to bulk-load cement for commercial clients as well as to package and load cement in bags for sale in local retail markets. Road transport via the Kinshasa-Matadi highway (RN 1) and a provincial road (RP 111) will be used to import raw materials and export products from the operation. Water will be sourced from the Lukunga river for the manufacturing facility, the temporary construction camp for approximately 1,200 workers and the residential village for the operation’s permanent workforce, which is projected to be approximately 275 full-time employees.An engineering, procurement, and construction (EPC) contractor has been appointed for the project, and construction is expected to commence in the middle of 2014 with plant commissioning scheduled two years later.

Original sector

H-AA - Cement

Location

Country

Democratic Republic of the Congo (DRC)

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Road, Manufacturing (Industrial), Residential, Commercial, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project