logo
ProjectClosed

PPC Deck Beam Bridge Improvements

Closed · Illinois · Last reported Jul 2025

Source: Dodge

Project consists of constructing a 82 ft bk-bk abutment PPC deck beam bridge on a new alignment. 855 cu yd Earth Excavation; 2311 cu yd Furnished Excavation; 400 tons Stone Riprap, Class A5; 1140 tons Aggregate Surface Course, Type B; 26.6 cu yd Concrete Structures; 1920 sq ft PPC Deck Beams (33" Depth); 164 ft Steel Railing, Type S1; 376 ft Furn and Drive Metal Shell Piles 12"x0.25"; 2 each Test

Status
Closed
Sector
Bridge, Water Supply and Storage, Road, Metal, Waste Processing and Treatment, Rail, Steel, Commercial, Cement, Government
Location
Quincy, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about PPC Deck Beam Bridge Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PPC Deck Beam Bridge Improvements” is an infrastructure initiative in the Bridge sector, located in Quincy, Illinois, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project consists of constructing a 82 ft bk-bk abutment PPC deck beam bridge on a new alignment. 855 cu yd Earth Excavation; 2311 cu yd Furnished Excavation; 400 tons Stone Riprap, Class A5; 1140 tons Aggregate Surface Course, Type B; 26.6 cu yd Concrete Structures; 1920 sq ft PPC Deck Beams (33" Depth); 164 ft Steel Railing, Type S1; 376 ft Furn and Drive Metal Shell Piles 12"x0.25"; 2 each Test Piles Metal Shells; 212 ft Pipe Culverts, Class D, Type 2 various diameters; 1 each Manhole, Type...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Quincy

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Bridge, Water Supply and Storage, Road, Metal, Waste Processing and Treatment, Rail, Steel, Commercial, Cement, Government

Article published date

2025-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project