PPC Deck Beam Bridge Removal & Construction
Closed · Illinois · Last reported Dec 2024
Source: Dodge USA
Work involves the removal of an existing three span PPC deck beam bridge and the construction of a single span bridge. The proposed single span structure consists of 33" deep PPC deck beams, 3' wide and 74'-8" in length, with no skew. The structure is 76'-8" back-to-back of abutments with a deck width of 27'-0" out to out. The work also includes a total of approx. 1,270' of approach roadway.
- Status
- Closed
- Sector
- Commercial, Bridge, Road
- Location
- Hillsboro, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about PPC Deck Beam Bridge Removal & Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work involves the removal of an existing three span PPC deck beam bridge and the construction of a single span bridge. The proposed single span structure consists of 33" deep PPC deck beams, 3' wide and 74'-8" in length, with no skew. The structure is 76'-8" back-to-back of abutments with a deck width of 27'-0" out to out. The work also includes a total of approx. 1,270' of approach roadway. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Hillsboro |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Road |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
