PPWWTF Outfall Replacement
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge USA
Upland and bathymetric surveying, Sewer design and engineering, Trenchless pipe installation method selection and design, Environmental impact assessment, mitigation planning, and permitting, Public and railway right of way permitting, Easement acquisition.
- Status
- Closed
- Sector
- Mass Transit, Water Supply and Storage, Rail, Waste Processing and Treatment, Government, Commercial
- Location
- Lynnwood, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about PPWWTF Outfall Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Upland and bathymetric surveying, Sewer design and engineering, Trenchless pipe installation method selection and design, Environmental impact assessment, mitigation planning, and permitting, Public and railway right of way permitting, Easement acquisition. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Lynnwood |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Water Supply and Storage, Rail, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in United States of America
- WMATA Orange and Blue Line Rehabilitation
- Dulles Metrorail Silver Line, Phase 2
- Broadway Substation Upgrades
- QLINE Streetcar Overhead Catenary System
- Blue Line Rail Power System Upgrades
- Congress Heights Station & Tunnel
- Navy Yard Metro West Entrance Modifications
- BART El Cerrito Del Norte Station Modernization Project
