PR 332 Grading
One of 10,000+ projects Taiyo tracks in Manitoba.
Source: Dodge USA
Re-grading of the slope failure of the roadway embankment, including widening of the grade slope, relocation of ditch bottom, culvert extensions, and new gravel surface on Provincial Road 332, from 1.7km north of Provincial Trunk Highway 2 to 3.4km north of Provincial Trunk Highway 2, for a total construction distance of 1.7km in the Rural Municipality of MacDonald.
- Status
- Prospective
- Sector
- Commercial, Government, Road, Manufacturing (Industrial)
- Location
- Macdonald, Manitoba, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about PR 332 Grading
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Re-grading of the slope failure of the roadway embankment, including widening of the grade slope, relocation of ditch bottom, culvert extensions, and new gravel surface on Provincial Road 332, from 1.7km north of Provincial Trunk Highway 2 to 3.4km north of Provincial Trunk Highway 2, for a total construction distance of 1.7km in the Rural Municipality of MacDonald. |
Procurement method |
Location
Country | Canada |
State | Manitoba |
City | Macdonald |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Road, Manufacturing (Industrial) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
