PRA Bihar BESS Project Acquisition
Sector: Power Generation (CCGT) • Location: Bihar, India
Source: Power Peak Digest
Enviro Infra Engineers Limited, through its subsidiary, has acquired an initial 49% stake in PRA Bihar Bess Private Limited, developing a 37.5 MW / 150 MWh battery energy storage system project in Bihar, with the remaining 51% to be acquired within 60 days after COD.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Energy Storage
- Location
- Bihar, India
- Updated
- 22 Jul 2026
- Source
- Power Peak Digest
ConstructChat
Ask ConstructChat about PRA Bihar BESS Project Acquisition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Enviro Infra Engineers Limited, through its subsidiary, has acquired an initial 49% stake in PRA Bihar Bess Private Limited, developing a 37.5 MW / 150 MWh battery energy storage system project in Bihar, with the remaining 51% to be acquired within 60 days after COD. |
Original sector | Power |
Location
Country | India |
State | Bihar |
Source
Source | Power Peak Digest |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Energy Storage |
Article published date | 2026-04-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
