logo

PRA Bihar BESS Project Acquisition

Sector: Power Generation (CCGT) • Location: Bihar, India

Source: Power Peak Digest

Project
In Progress

Enviro Infra Engineers Limited, through its subsidiary, has acquired an initial 49% stake in PRA Bihar Bess Private Limited, developing a 37.5 MW / 150 MWh battery energy storage system project in Bihar, with the remaining 51% to be acquired within 60 days after COD.

Status
Under Construction
Sector
Power Generation (CCGT), Energy Storage
Location
Bihar, India
Updated
22 Jul 2026
Source
Power Peak Digest

ConstructChat

Ask ConstructChat about PRA Bihar BESS Project Acquisition

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “PRA Bihar BESS Project Acquisition” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Bihar, India. Taiyo aggregates data on it from Power Peak Digest.

Participants

Not available for this record.

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Enviro Infra Engineers Limited, through its subsidiary, has acquired an initial 49% stake in PRA Bihar Bess Private Limited, developing a 37.5 MW / 150 MWh battery energy storage system project in Bihar, with the remaining 51% to be acquired within 60 days after COD.

Original sector

Power

Location

Country

India

State

Bihar

Source

Source

Power Peak Digest

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Energy Storage

Article published date

2026-04-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project