Prado Dam Safety Modification Project
The owner, status and timeline of this project. A free account opens every field.
Source: Army.mil
Dam safety project to replace the existing spillway and raise the spillway crest elevation at Prado Dam to improve flood protection for approximately 1.4 million residents of Southern California. Part of the Santa Ana River Mainstem Project. Construction contract awarded to begin preconstruction services in March 2025, with construction starting in 2027 and expected completion in 2032.
- Status
- Prospective
- Sector
- Hydro, Water Supply and Storage, Government
- Location
- California, United States of America
- Updated
- 22 Jul 2026
- Source
- Army.mil
ConstructChat
Ask ConstructChat about Prado Dam Safety Modification Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Dam safety project to replace the existing spillway and raise the spillway crest elevation at Prado Dam to improve flood protection for approximately 1.4 million residents of Southern California. Part of the Santa Ana River Mainstem Project. Construction contract awarded to begin preconstruction services in March 2025, with construction starting in 2027 and expected completion in 2032. |
Original sector | Built Sector |
Location
Country | United States of America (USA) |
State | California |
Source
Source | Army.mil |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Government |
Article published date | 2025-12-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
