Prado East Well Improvements
Sector: Power Generation (CCGT) • Location: Chino, California, United States of America
Source: Dodge USA
Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the rehab of an existing well including the furnishing and installation of pump, electrical, storage tank, booster pump package and piping. Project also proposes the construction of a pipeline on the property from the pump and storage site to the irrigation site
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Government, Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Chino, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Prado East Well Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the rehab of an existing well including the furnishing and installation of pump, electrical, storage tank, booster pump package and piping. Project also proposes the construction of a pipeline on the property from the pump and storage site to the irrigation site, as shown on the Bid Documents, including the Plans and Specifications. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Chino |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
