Praia do Paiva Bridge

Sector: Road • Location: Brazil

Source: World Bank Group

Project
Active

The new 320-meter long bridge links the capital of the state of PE, Recife, to the tourist area of Jaboatao. Via Parque was the concessionaire that won the bidding process in December 2006 by offering the lowest government revenue guaranteeabove the minimum set by the economic feasibiability(BRL 44.128 million). The other bidders were the Brazilian construction companies Andrade Gutierrez and OAS,

Project Information FAQ

Project Information

4 Q
The project “Praia do Paiva Bridge” is an infrastructure initiative in the Road sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The new 320-meter long bridge links the capital of the state of PE, Recife, to the tourist area of Jaboatao. Via Parque was the concessionaire that won the bidding process in December 2006 by offering the lowest government revenue guaranteeabove the minimum set by the economic feasibiability(BRL 44.128 million). The other bidders were the Brazilian construction companies Andrade Gutierrez and OAS, with a BRL 45 million offer; and the Brazilian construction companies Camargo Correa and Queiroz Galvao, with a BRL 44.7 million offer. The contract was signed in December 2006 and was structured under the new PPP legislation. Via Parque S.A., a special purpose company under the control of Odebrecht (75%), throught its subsidiary Odebrecht TransPort, and Grupo Cornelio Brennand (25%), committed to invest US$ 39.2 million (BRL 76.5 million) in constructing the new bridge and US$ 34.2 million (BRL 66.7 million) in maintaining the facility over the 33-year concession period. Construction works commenced in December 2007 and financing was partly provided by a loan from Banco do Nordeste do Brasil (loan of BRL 52.9 million). The construction works were concluded in the end of 2009, when the toll rates started being charged. Source of information: sponsors, concession contract, state government website, news media

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data