logo
ProjectClosed

Prairie Lakes Phase 3 Sections 1 & 2

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The work shall consist of the following: Drainage piping, including approximately 18 - 48 RCP, headwalls, manholes, inlets and appurtenances; Water piping, including 8 and 16 mains, valves and appurtenances; Gravity wastewater piping consisting of 8 12 PVC mains, manholes and appurtenance; Paving, sidewalk, curb and gutter, signage and striping; Excavation, embankment and lot grading; Sedimentatio

Status
Closed
Sector
Commercial, Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Mass Transit, Automotive, Rail, Government
Location
San Marcos, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Prairie Lakes Phase 3 Sections 1 & 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Prairie Lakes Phase 3 Sections 1 & 2” is an infrastructure initiative in the Commercial sector, located in San Marcos, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work shall consist of the following: Drainage piping, including approximately 18 - 48 RCP, headwalls, manholes, inlets and appurtenances; Water piping, including 8 and 16 mains, valves and appurtenances; Gravity wastewater piping consisting of 8 12 PVC mains, manholes and appurtenance; Paving, sidewalk, curb and gutter, signage and striping; Excavation, embankment and lot grading; Sedimentation and Erosion Control; and Various Other Site Improvements.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

San Marcos

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Mass Transit, Automotive, Rail, Government

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project