Prairie Mist Solar - 100 MW
Sector: Power Generation (CCGT) • Location: Mist, Arkansas, United States of America
Source: Dodge USA
700 acre site with 250,000 PV panels for 100 MW, enough to power around 22,000 homes annually. To be linked to Entergy's transmission system within the operating area of the Midcontinent Independent System Operator (MISO)
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Solar, Residential, Commercial
- Location
- Mist, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Prairie Mist Solar - 100 MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 700 acre site with 250,000 PV panels for 100 MW, enough to power around 22,000 homes annually. To be linked to Entergy's transmission system within the operating area of the Midcontinent Independent System Operator (MISO) |
Budget |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Mist |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Residential, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
