logo
ProjectConstruction

Prairie Sunlight I Solar Project

One of 10,000+ projects Taiyo tracks in Alberta.

Source: Dodge USA

Solar farm - 40.5 mW Solar Photovoltaic Array project - Estimated to generate roughly 80 gigawatt hours of electricity annually offsetting 47500 tonnes of greenhouse gas emissions annually and generating enough electricity to power more than 10000 Alberta homes

Status
Under Construction
Sector
Power Generation (CCGT), Raw Materials, Residential, Solar, Commercial
Location
Taber, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Prairie Sunlight I Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Prairie Sunlight I Solar Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Taber, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Solar farm - 40.5 mW Solar Photovoltaic Array project - Estimated to generate roughly 80 gigawatt hours of electricity annually offsetting 47500 tonnes of greenhouse gas emissions annually and generating enough electricity to power more than 10000 Alberta homes

Budget

Location

Country

Canada

State

Alberta

City

Taber

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Raw Materials, Residential, Solar, Commercial

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project