The Peter D. Binney Purification Facility located near Aurora Reservoir was built as part of the Prairie Waters Project. Image courtesy of ©CH2M HILL 2010. The conveyance pipeline is 34m (54.7km) long. Image courtesy of ©CH2M HILL 2010. The city of Aurora's Mayor Ed Mayor Tauer dedicating the Prairie Waters Project. Image courtesy of ©CH2M HILL 2010. Prairie Waters Project is a huge water supply

Project Information FAQ

Project Information

5 Q
The project "Prairie Waters Project, Aurora, Colorado, US" is an infrastructure initiative in the Advanced Electronics, Chemical (Industrial), Steel, Tunnel, Water Supply and Storage, Manufacturing (Industrial), Metal sector, located in N/A, Thailand. Taiyo aggregates data from Water Technology, including information on sponsoring government bodies, EPCs, and contractors.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Peter D. Binney Purification Facility located near Aurora Reservoir was built as part of the Prairie Waters Project. Image courtesy of ©CH2M HILL 2010. The conveyance pipeline is 34m (54.7km) long. Image courtesy of ©CH2M HILL 2010. The city of Aurora's Mayor Ed Mayor Tauer dedicating the Prairie Waters Project. Image courtesy of ©CH2M HILL 2010. Prairie Waters Project is a huge water supply scheme, implemented by the city of Aurora in the state of Colorado, to supply the South Platte River’s water to the city. The construction work on the project began in 2006. It was completed in October 2010 with an investment of $653m. The project supplies about 3.3 billion gallons of water per annum and treats about 50 million gallons of water every day. It serves more than 300,000 people in the city of Aurora, and is expected to meet the water needs of the city until 2030. CH2M HILL, the main contractor, delivered the project two months ahead of schedule and at a reduced final cost. The initial budget estimated for the project was $754m. Prairie Waters Project won the Project Management Institute’s (PMI) Project of the Year Award in 2011. The project was undertaken following the drought conditions that the city of Aurora experienced for a few years, beginning from 2000. The water reserves available to the city became minimal and were not enough to serve the huge population. The scarcity of water in Aurora, along with very limited alternatives to its water problem and the expected future population growth, necessitated a sound solution to meet the future water needs of the city. Prairie Waters Project was chosen from about 50 proposals that were brought forward to tackle the problem. The implementation of the project called for various rigorous stakeholder agreements, approval and completion permits, and cases dealing with the use of land for the project. Prairie Waters Project comprised of constructing an aquifer recharge and recovery (ARR) basin, three pumping stations, 34mi (54.7km) of pipeline and a 50mgd water purification facility, known as Peter D. Binney Purification Facility. The pipes used for the project range from 60 to 79 inches in diameter. The steel pipes were coated with polyurethane, mortar-lined and provided with cathodic protection system. The pipes were enclosed in 15 casings of about 84 inches diameter. The three pumping stations, with a conveyance capacity of about 21,000 cubic feet, are rated at 6,000HP. The raw water reaching the Prairie Waters Project goes through various steps before finally being delivered to the residents of Aurora. The water is pumped from 17 wells located within the confines of the South Platte River Banks and piped to the ARR basin, where it is first naturally purified by allowing to flow through sand and gravel. The water from the ARR basin is then piped through the 34mi pipeline to the three pumping stations. It is further sent to the Peter D. Binney Purification Facility located near the Aurora Reservoir. The treatment process at the Binney Purification Facility comprises of softening to remove excess calcium and magnesium, advanced ultraviolet light oxidation, followed by granular media filtration and activated carbon absorption. The purified water from the Binney D. Purification Facility is sent to the Robertsdale Tank and Pumping station for distribution. MWH Americas provided management consulting, design and engineering services for the project. HDR Engineering acted as the third party engineer providing construction management services, along with CH2M HILL and MWH. The microtunnelling works were carried out by Btrenchless and Reynolds Tierdael (GC). The pipeline was designed by Denver while the Robertsdale pumping station was designed by Brown & Calweld along with Golden and Colo. Various legal works associated with water rights for the project were undertaken with assistance from Deere & Ault Consultants. The permissions regarding the construction of tunnels in various sensitive areas were sought through the guidance of Brownstein. Defence budget cuts and a first drop in US spending since 1998 ensured military spending in 2011 didn’t exceed $1.738bn. The Santa Paula water recycling facility (WRF) is a membrane bioreactor (MBR)-based, 3.4MGD (expandable to 4.2MGD) water recycling facility located in the City of Santa Paula, California. Now that the Earth’s population has reached seven billion how will future generations cope with an escalating water crisis? Small-scale water purification systems can be the ideal solution for areas with poor water treatment infrastructure.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data