Pre-investment study for the regional Transmission line Kibuye (Rwanda) - Goma (DRC) - Birembo (Rwanda)

Sector: Power Generation (CCGT) • Location: Rwanda

Source: European Union Africa Infrastructure Trust Fund

Project
Close

The objective of the Rwanda – DRC transmission line is to contribute to a reliable and cost-effective power supply in particular in the load centres Goma and Kigali. Through a qualitatively and quantitatively improved energy supply, the economic and social development in Rwanda and the Eastern DRC will be promoted, in addition to strengthening regional integration. The project is part of the larg

Project Information FAQ

Project Information

4 Q
The project “Pre-investment study for the regional Transmission line Kibuye (Rwanda) - Goma (DRC) - Birembo (Rwanda)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Rwanda. Taiyo aggregates data on it from European Union Africa Infrastructure Trust Fund.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Rwanda – DRC transmission line is to contribute to a reliable and cost-effective power supply in particular in the load centres Goma and Kigali. Through a qualitatively and quantitatively improved energy supply, the economic and social development in Rwanda and the Eastern DRC will be promoted, in addition to strengthening regional integration. The project is part of the larger NELSAP programme, which creates a regional power exchange market among the five NELSAP countries Burundi, DRC, Kenya, Rwanda and Uganda. Due to the insolvency of the substation contractor Isolux the project is currently seriously delayed. However, efforts are being undertaken to finalize works by end-2020. The EU-AITF Technical Assistance was used for the funding of a study defining the formal and technical selection criteria for pre-qualification of bidders and the preparation of an End-of-line document for Engineering, Procurement and Construction contractors. The winning bidder, Fichtner Germany, started works in June 2010. The feasibility study and the detailed design and tender documents of the transmission line were finalized and approved by all stakeholders at the beginning of June 2012.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data