Pre-K Playground Site Work
Sector: Car parking • Location: Beaverton, Oregon, United States of America
Source: Dodge USA
GENERAL SCOPE OF WORK: The General Scope of this Project is to retain a General Contractor (GC) to provide all labor, tools and materials for site work construction at Elmonica Elementary School and Fir Grove Elementary School. The site work construction at each school is to prepare for installation of pre-k playground equipment and playground turf surface. All work must be completed over the 2024
- Status
- Closed
- Sector
- Car parking, Government, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Beaverton, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pre-K Playground Site Work
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | GENERAL SCOPE OF WORK: The General Scope of this Project is to retain a General Contractor (GC) to provide all labor, tools and materials for site work construction at Elmonica Elementary School and Fir Grove Elementary School. The site work construction at each school is to prepare for installation of pre-k playground equipment and playground turf surface. All work must be completed over the 2024 summer break. The Work is described in more detail in the Statement of Work and in the Exhibits ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Beaverton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Government, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
