Pre-Overlay Pipe Lining
One of 10,000+ projects Taiyo tracks in Colorado.
Source: Dodge USA
A. Work on Broadmoor Hills Dr consists of lining Pipe 1 which is approximately 45 linear feet of existing 12-inch-diameter corrugated metal storm pipe. Voids are present around the pipe approximately 20 linear feet from the upstream inlet. Voids shall be filled as needed with flow fill without excavation and/or cutting the pavement above the pipe. Pipe has upstream access by inlet and downstream a
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Colorado Springs, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pre-Overlay Pipe Lining
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A. Work on Broadmoor Hills Dr consists of lining Pipe 1 which is approximately 45 linear feet of existing 12-inch-diameter corrugated metal storm pipe. Voids are present around the pipe approximately 20 linear feet from the upstream inlet. Voids shall be filled as needed with flow fill without excavation and/or cutting the pavement above the pipe. Pipe has upstream access by inlet and downstream access by outlet located in drainage ditch. B. Work on Custer Ave consists of lining Pipe 2 which ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Colorado Springs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
