logo
ProjectClosed

Precast Concrete Double Vault Toilet

Sector: Steel • Location: Burbank, Washington, United States of America

Source: Dodge USA

Ice Harbor Tri-Rivers Natural Resources Concrete Double Vault Toilets Contractor shall furnish, deliver, and install three double vault restroom buildings: one in Charbonneau Park, one in Levey Park, and one in Windust Park. Meets ADA requirements b. Fully vandal-resistant building, vault and interior components c. Includes all interior and exterior signage with reflective exterior signs d. Replac

Status
Closed
Sector
Steel, Seaport, Cement, Commercial, Car parking, Automotive, Oil and Gas, Metal
Location
Burbank, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Precast Concrete Double Vault Toilet

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Precast Concrete Double Vault Toilet” is an infrastructure initiative in the Steel sector, located in Burbank, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ice Harbor Tri-Rivers Natural Resources Concrete Double Vault Toilets Contractor shall furnish, deliver, and install three double vault restroom buildings: one in Charbonneau Park, one in Levey Park, and one in Windust Park. Meets ADA requirements b. Fully vandal-resistant building, vault and interior components c. Includes all interior and exterior signage with reflective exterior signs d. Replaceable components shall be interchangeable e. Four-inch-thick steel, reinforced concrete walls f. ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Burbank

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Steel, Seaport, Cement, Commercial, Car parking, Automotive, Oil and Gas, Metal

Article published date

2024-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project