logo

Prefabricated Sloped Ends Pedestrian Bridge REBID

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Project
Closed

II.GENERAL SPECIFICATION Span: 32 Ft 4 x 6 -0" truss bridge Bridge Length end-to-end 32 feet 4 Inches Bridge width 6 out-to-out, with deck area clearance of 5 minimum. III.DESIGN SPECIFICATIONS: Pedestrian bridge, AASHTO Specification Design live load = 85 psf 42" handrail height above decking Bridge material., lightweight Fiberglass Reinforced Polymer (RFP). Bridge deck, Composite material only S

Status
Closed
Sector
Bridge, Chemical (Industrial), Steel, Road, Government, Metal, Commercial, Manufacturing (Industrial)
Location
Arlington, Virginia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Prefabricated Sloped Ends Pedestrian Bridge REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Prefabricated Sloped Ends Pedestrian Bridge REBID” is an infrastructure initiative in the Bridge sector, located in Arlington, Virginia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

II.GENERAL SPECIFICATION Span: 32 Ft 4 x 6 -0" truss bridge Bridge Length end-to-end 32 feet 4 Inches Bridge width 6 out-to-out, with deck area clearance of 5 minimum. III.DESIGN SPECIFICATIONS: Pedestrian bridge, AASHTO Specification Design live load = 85 psf 42" handrail height above decking Bridge material., lightweight Fiberglass Reinforced Polymer (RFP). Bridge deck, Composite material only Sloped Ends Stainless steel bolts Custom color: Grey Due to limited accessibility to the site, pre...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Arlington

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Chemical (Industrial), Steel, Road, Government, Metal, Commercial, Manufacturing (Industrial)

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project