Prefeasibility Study Use Puyango-Tumbes River
Sector: Water Supply and Storage • Location: Regional
Source: Inter-American Development Bank (IADB)
The study that will be undertaken is a pre-feasibility study, whose general objective is to analyze the technical and economical viability of several hydrological works, including irrigation as well as hydro-electrical generators that are linked to the use of the water resources of the Puyango-Tumbes River, in Ecuador and Perú. The specific objectives of this study are the following: (i) analyze a
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The study that will be undertaken is a pre-feasibility study, whose general objective is to analyze the technical and economical viability of several hydrological works, including irrigation as well as hydro-electrical generators that are linked to the use of the water resources of the Puyango-Tumbes River, in Ecuador and Perú. The specific objectives of this study are the following: (i) analyze and reformulate, if necessary, the works corresponding to the water dams of Cazaderos y Marcabeli; (ii) explore the possibility to develop alternatives projects using the waters from the Puyango-Tumbes River and which would supply totally or partially for the irrigation demand, and (iii) evaluate the different works from a technical and economic viability standpoint in order to maximize the water resources of the Puyango-Tumbes River. As a result of this pre-feasibility study, several work projects will be identified compatible with the economic and financial capacity of the respective countries. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in Regional
- Paladin Latin America Zero Carbon Affordable Housing Fund
- Regional Economics of Climate Change in South Asia Part II: Adaptation and Impact Assessment
- Strengthening Capacity of Developing Member Countries for Implementation of ADB’s Environmental and Social Framework
- Strengthening Capacity of Developing Member Countries for Implementation of ADB’s Environmental and Social Framework
- Financial Sustainability of Early-stage Infrastructure Development—
- Financial Sustainability of Early-stage Infrastructure Development—
- Financial Sustainability of Early-stage Infrastructure Development—
- Financial Sustainability of Early-stage Infrastructure Development—
