logo

Prelimary planning railway line Hagen-Siegen-Hanau

Sector: Manufacturing (Industrial) • Location: Germany

Source: EU Funding & Tenders Portal

Project
Ended

The freight routes along the Middle Rhine are among the busiest rail routes in Europe. Goods trains run on this axis between the major transhipment ports of Rotterdam and Genoa. Moreover, there are also numerous important industrial locations along the route. To identify congestion-relieving measures, the Federal Ministiry for Digital and Transport (BMDV) initiated the Middle Rhine Study. This St

Project Information FAQ

Project Information

4 Q
The project “Prelimary planning railway line Hagen-Siegen-Hanau” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Germany. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The freight routes along the Middle Rhine are among the busiest rail routes in Europe. Goods trains run on this axis between the major transhipment ports of Rotterdam and Genoa. Moreover, there are also numerous important industrial locations along the route. To identify congestion-relieving measures, the Federal Ministiry for Digital and Transport (BMDV) initiated the Middle Rhine Study. This Study was published in 2015. The following measures were identified as core measures for the new construction and expansion of the Middle Rhine corridor: (a) Rhine/Main-Rhine/Neckar, (b) (Mannheim)-Molzau-Karlsruhe and (c) Cologne/Hagen-Siegen-Gießen-Hanau (Sieg route/Ruhr-Sieg route). However, the project includes the planning for the development of an alternative route to relieve the Middle Rhine corridor.The project relates to planning measures on the section c) Cologne/Hagen-Siegen-Gießen-Hanau Ruhr-Sieg route) as follows: WP 1 Internal and external project management WP 2 Subsoil investigations WP 3 Public participation WP 4 PS1 (= planning section 1) BIM preliminary planning WP 5 PS2 BIM preliminary planning WP 6 PS3 BIM preliminary planning WP 7 PS4 BIM preliminary planning WP 8 Construction supervision and construction planning / securing services WP 9 Subsoil assessment/ geotechnical /tunnelling advice The project is planned and implemented using Building Information Modeling (BIM) methodology. The aim is to achieve greater planning and implementation security (timely process, cost transparency, fewer supplements).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data