logo

Preliminary Design of Integrated Road-Sewer-Water Renewal for Florence St (Kent-Bank) and McLeod Ave (Bronson-Lyon, Kent-Bank)

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

This is a design only project. This project is to complete the preliminary design of a future construction project that will include rehabilitation of the existing combined sewer (750mm) within Florence from Kent Street to Bank Street. The extent of the design also includes rehabilitating the existing watermain (203mm) in McLeod Street from Bronson Avenue to Bay Street and the combined sewer (900/

Project Information FAQ

Project Information

4 Q
The project “Preliminary Design of Integrated Road-Sewer-Water Renewal for Florence St (Kent-Bank) and McLeod Ave (Bronson-Lyon, Kent-Bank)” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This is a design only project. This project is to complete the preliminary design of a future construction project that will include rehabilitation of the existing combined sewer (750mm) within Florence from Kent Street to Bank Street. The extent of the design also includes rehabilitating the existing watermain (203mm) in McLeod Street from Bronson Avenue to Bay Street and the combined sewer (900/1050mm) in McLeod Street from Bronson Avenue to Lyon Avenue. The extent of the design also includes the full road reconstruction including curbs and sidewalks as required and trench reinstatement with resurfacing will be implemented where feasible. The scope of design work for McLeod Street from Kent Street to Bank Street will be limited to road resurfacing. The design will determine the exact requirements.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data