Preparation for Raleigh Garage Facility Expansion
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
Project Outcomes and Objectives: The proposed project involves two components: site remediation of the Durham Region Transit (DRT) Raleigh property post construction of the new maintenance facility that was completed in mid-2017; and replacement of overhead doors at the indoor bus storage facilities at the 710 Raleigh facility. The remediation of the property would involve demolition of the existi
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Oil and Gas, Government, Automotive
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Preparation for Raleigh Garage Facility Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Outcomes and Objectives: The proposed project involves two components: site remediation of the Durham Region Transit (DRT) Raleigh property post construction of the new maintenance facility that was completed in mid-2017; and replacement of overhead doors at the indoor bus storage facilities at the 710 Raleigh facility. The remediation of the property would involve demolition of the existing maintenance facility, excavation and disposal of buried infrastructure (underground storage tanks, oil/water separators, hoists, and fuel dispensing equipment) and limited removal of impacted soil. In addition, free product recovery work will be done using the Dual Phase Extraction (DPE) to reduce concentrations of contamination remaining in soil and groundwater. This alternative approach to addressing soil contamination comes at a reduced cost compared to the originally proposed approach which involved significantly greater excavation/removal/backfill work. Replacement of the overhead doors is meant to address the deteriorating state of the doors. Project Readiness: The Region has completed background site Investigations over the last few years to ascertain the level and nature of remediation that may be necessary, post completion of the new maintenance facilily on-site. A business case has also been completed for replacement of the legacy overhead doors How the Project Fits with Strategic plan: The proposed project advances best practices and the Region’s strategic goals of efficient environmental management and asset management. |
Original sector | Public Transit |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Oil and Gas, Government, Automotive |
Article published date | 2025-07-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
