Preparation Studies Binational Bridge Carmelo Peralta - Porto Mourtinho
Sector: Commercial • Location: Regional
Source: Inter-American Development Bank (IADB)
The general objective of this Regional Technical Cooperation (TC) is to support the realization of the necessary investments to improve road connectivity between Brazil and Paraguay, through the elaboration of the studies that are necessary for the preparation, structuring and implementation of the "International Bridge over the Paraguay River". This project will be located between the towns of Ca
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The general objective of this Regional Technical Cooperation (TC) is to support the realization of the necessary investments to improve road connectivity between Brazil and Paraguay, through the elaboration of the studies that are necessary for the preparation, structuring and implementation of the "International Bridge over the Paraguay River". This project will be located between the towns of Carmelo Peralta (PR) and Puerto Murtinho (BR), and the new bridge over the Parana. These will include the construction of a border bridge, the expansion or adaptation of the infrastructure that could be complementary to them (ports, border center and road paving), which also provide connectivity alternatives, as well as the elaboration of improvement projects for operational and institutional character.The specific objectives are: (i) to evaluate the viability of the construction of the bridges and their complementary works between Carmelo Peralta and Puerto Murtinho, and the new bridge over the Paraná, between the towns of Ciudad del Este and Foz de Iguazú; (ii) propose operational and / or institutional improvements that allow efficient social and commercial exchanges between both cities; and (iii) identify and evaluate the interrelationships between the different mains of transport, as well as the need for investments to facilitate intermodal transfers and regional insertion and complementarity. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
