Preparing the Climate Adaptive Water Resources Management in the Aral Sea Basin Project
Sector: Road • Location: Uzbekistan
Source: Asian Development Bank (ADB)
The transaction TA will support the government to prepare subproject feasibility studies of representative irrigation and drainage subprojects to be developed under the ensuing loan. This will increase agricultural water use productivity through a threefold approach: (i) climate resilient and modernized I&D infrastructure to improve measurement, control and conveyance within existing systems; (ii)
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The transaction TA will support the government to prepare subproject feasibility studies of representative irrigation and drainage subprojects to be developed under the ensuing loan. This will increase agricultural water use productivity through a threefold approach: (i) climate resilient and modernized I&D infrastructure to improve measurement, control and conveyance within existing systems; (ii) enhanced and reliable on-farm water management including capacity building of water users, physical improvements for land and water management at the farm level and application of high level technologies for increased water productivity; and (iii) policy and institutional strengthening for sustainable water resources management. The feasibility studies will identify proposed interventions and include technical (modernized engineering designs) and environmental, social and economic and financial assessments. It will identify suitable actions for gender inclusiveness in water resources management, decision making and income generation. The TA will identify requirements for strategy and policy, legal and institutional road development for improved water resources management (from the river basin to on-farm) including opportunities for introducing technologies. It will also highlight areas for capacity building support in technical, procurement, financial management etc. for relevant project agencies. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
