logo
ProjectClosed

Preschool Playground Replacement

Sector: Education • Location: Kingston, Massachusetts, United States of America

Source: Dodge

Install and build a new playground (approximately 1655 square foot area) for the Silver Lake Preschool located at Silver Lake High School, 260 Pembroke St, Kingston, MA.Work to commence April 2025. The project will include removal of old playground, new playground equipment, installation of that equipment, and twenty-five* yards of engineered wood fiber playground mulch (installed). Playground str

Status
Closed
Sector
Education, Government, Commercial, Car parking, Automotive
Location
Kingston, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Preschool Playground Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Preschool Playground Replacement” is an infrastructure initiative in the Education sector, located in Kingston, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Install and build a new playground (approximately 1655 square foot area) for the Silver Lake Preschool located at Silver Lake High School, 260 Pembroke St, Kingston, MA.Work to commence April 2025. The project will include removal of old playground, new playground equipment, installation of that equipment, and twenty-five* yards of engineered wood fiber playground mulch (installed). Playground structures need to include the following Playworld items (or equivalent): Play Structure #350-2230 P...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Kingston

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Education, Government, Commercial, Car parking, Automotive

Article published date

2025-02-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project