logo

President George Bush Turnpike Western Extension (SH 161)

Sector: Airport • Location: Texas, United States of America

Source: Federal Highway Administration (FHWA)

Project
Close

State Highway (SH) 161, the President George Bush Turnpike Western Extension (PGBT WE), provides a new, approximately 11.5-mile link between SH 183, I-30, and I-20 as part of a western loop around Dallas through the cities of Irving and Grand Prairie south of Dallas-Fort Worth International Airport. SH 161 serves as a major link within the Dallas-Fort Worth regional transportation network, reducin

Project Information FAQ

Project Information

5 Q
The project “President George Bush Turnpike Western Extension (SH 161)” is an infrastructure initiative in the Airport sector, located in Texas, United States of America. Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

State Highway (SH) 161, the President George Bush Turnpike Western Extension (PGBT WE), provides a new, approximately 11.5-mile link between SH 183, I-30, and I-20 as part of a western loop around Dallas through the cities of Irving and Grand Prairie south of Dallas-Fort Worth International Airport. SH 161 serves as a major link within the Dallas-Fort Worth regional transportation network, reducing congestion along adjacent corridors, including the parallel State Highway 360. In April 2008, the Texas Department of Transportation (TxDOT) agreed to a concession with NTTA in perpetuity (with revenue and capital improvement cost sharing after 52 years) to own, operate, and complete the project's construction. The negotiated value of the agreement was $1.068 billion, including a $458 million upfront payment (plus interest) to TxDOT for prior costs incurred on Phase 4 of the project and the obligation for NTTA to build Phase 4 of the project and the toll gantries for Phases 2 and 3 (see below). The new toll road is being constructed in four phases: Phase 1: An interchange with SH 183 and service roads from North Carrier Parkway to I-20, constructed by TxDOT (open in August 2009) Phase 2: Two toll lanes in each direction from SH 183 to Egyptian Way, constructed by TxDOT (open in August 2009) Phase 3: Services roads and a third toll lane in each direction from Conflans Road to North Carrier Parkway, constructed by TxDOT (open in April 2010) Phase 4: Two toll lanes in each direction from North Carrier Parkway to I-20 with interchanges at I-30 and I-20 (open in October 2012; I-30 interchange (fully open in December 2012) Together with the original PGBT and its Eastern Extension, the roadway provides a 52-mile partial circumferential route around Dallas from I-20 in Grand Prairie to I-30 in Garland. The widening of the roadway to three lanes in each direction between I-30 and I-20 is in the planning phase.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data