Presidio Parkway (Phase II)
Sector: Bridge • Location: California, United States of America
Source: Federal Highway Administration (FHWA)
The Presidio Parkway project is a replacement of Doyle Drive, a 1.6-mile segment of Route 101 in San Francisco that is the southern access to the Golden Gate Bridge, connecting Marin and San Francisco counties and providing a major regional traffic link between the peninsula and North Bay Area counties. The existing structure, built in 1936, did not meet current highway standards and was seismical
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Presidio Parkway project is a replacement of Doyle Drive, a 1.6-mile segment of Route 101 in San Francisco that is the southern access to the Golden Gate Bridge, connecting Marin and San Francisco counties and providing a major regional traffic link between the peninsula and North Bay Area counties. The existing structure, built in 1936, did not meet current highway standards and was seismically deficient. The Presidio Parkway project area extends from the Golden Gate Bridge Toll Plaza on the west to Broderick Street on the east, and includes Richardson Avenue, Gorgas Avenue and Marina Boulevard. The Presidio Parkway is a six-lane facility with a southbound auxiliary lane between the Park Presidio Interchange and the new Presidio access at Girard Road. The roadway consists of various sections (from the toll plaza east to Richardson Avenue) with a landscaped median: a high-viaduct between the Park Presidio Interchange and the San Francisco National Cemetery (Presidio Viaduct) shallow cut-and-cover tunnels past the cemetery to Battery Blaney (Battery Tunnels) at-grade roadways to the Main Post cut-and-cover tunnels from the Main Post to east of Halleck Street (Main Post Tunnels) a low causeway from Halleck Street to Girard Road at-grade connection to Richardson Avenue The project has been developed in two phases. Caltrans was responsible for the design, financing and construction of Phase I. Phase I, delivered through a traditional design-bid-build process, consisted of a replacement bridge at the Park Presidio Interchange, the new southbound Presidio Viaduct, the southbound Battery Tunnel, and a temporary bypass east of the Main Post to allow construction of the Main Post Tunnels and roadway to Richardson Avenue. Through a competitive procurement process, Caltrans selected a private consortium, the Golden Link Concessionaire, to deliver Phase II as a design, build, finance, operate, and maintain (DBFOM) availability-pay concession. The P3 Project Agreement with GLC was executed on January 3, 2011. GLC is receiving milestone payments as construction activities reach substantial completion and will continue to receive quarterly availability payments through the concession period, based on performance. These payments are sourced from state and local transportation funds from a number of regional entities. These agencies include the San Francisco County Transportation Authority, which manages administration of a local transportation sales tax; the Golden Gate Bridge, Highway and Transportation District, which operates the bridge; the region's metropolitan planning organization - Metropolitan Transportation Commission; and two other regional planning and local tax-administering agencies - the Transportation Authority of Marin County and the Sonoma County Transportation Authority. Phase I construction was substantially completed and opened to the public on April 30, 2012. Phase II major construction began after the completion of Phase I and concluded in July 2015. Final landscaping and restoration continues through 2016. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
