logo

Presidio Parkway

Sector: Road • Location: California, United States of America

Source: Build America Bureau (BAB) Projects

Project
Credit Agreement Executed

The Presidio Parkway project is a replacement of Doyle Drive, a 1.6-mile segment of Route 101 in San Francisco that is the southern access to the Golden Gate Bridge, connecting Marin and San Francisco counties and providing a major regional traffic link between the peninsula and North Bay Area counties. Originally built in 1936, the project did not meet highway standards and was seismically defici

Project Information FAQ

Project Information

5 Q
The project “Presidio Parkway” is an infrastructure initiative in the Road sector, located in California, United States of America. Taiyo aggregates data on it from Build America Bureau (BAB) Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

credit agreement executed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Presidio Parkway project is a replacement of Doyle Drive, a 1.6-mile segment of Route 101 in San Francisco that is the southern access to the Golden Gate Bridge, connecting Marin and San Francisco counties and providing a major regional traffic link between the peninsula and North Bay Area counties. Originally built in 1936, the project did not meet highway standards and was seismically deficient.  The project area extends from the Golden Gate Bridge Toll Plaza on the west to Broderick Street on the east, and includes Richardson Avenue, Gorgas Avenue, and Marina Boulevard. The Presidio Parkway will be a six-lane facility with a southbound auxiliary lane between the Park Presidio Interchange and the new Presidio access at Girard Road. The project is being developed in two phases. Caltrans is responsible for the design, financing, and construction of Phase I. Phase I, delivered through a traditional design-bid-build process. Through a competitive procurement process, Caltrans selected a private consortium, the Golden Link Concessionaire, to deliver Phase II as a design, build, finance, operate, and maintain availability-pay concession. The project’s focus was to improve public safety hazards.  At the project’s inception, the facility carried approximately 120,000 auto trips per day, but it presented significant public risk as it was seismically vulnerable and structurally deficient.  In concert with safety improvements, the Presidio Parkway Project Sponsor estimates it will save commuting motorists 30 minutes in travel time with the addition of new access points, valued at approximately $1.095 billion annually. The project is expected to generate 400 construction phase jobs and a total economic impact of approximately $362 million. TIFIA financing allows for the realization of these benefits at financing cost savings of approximately $2.35 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data