Presidio Parkway
Sector: Bridge • Location: California, United States of America
Source: San Francisco County Transportation Authority
The Presidio Parkway serves as a regional gateway between the Golden Gate Bridge and the City of San Francisco. The parkway is a replacement of Doyle Drive, a 1.6-mile segment of U.S. 101 that reopened on July 12, 2015.
Originally built in 1936 as one of the New Deal projects, Doyle Drive had reached the end of its useful life after over 75 years of use.
Caltrans and the San Francisco County Tra
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Presidio Parkway serves as a regional gateway between the Golden Gate Bridge and the City of San Francisco. The parkway is a replacement of Doyle Drive, a 1.6-mile segment of U.S. 101 that reopened on July 12, 2015. Originally built in 1936 as one of the New Deal projects, Doyle Drive had reached the end of its useful life after over 75 years of use. Caltrans and the San Francisco County Transportation Authority jointly led the effort to replace Doyle Drive. The work was done in two phases: The first phase was built using a traditional design-bid-build approach and the second via a public-private partnership. The latter enabled the project to be built sooner and includes a 30-year maintenance agreement by the private concessionaire to ensure the roadway remains at a high level of operational and maintenance performance for the public. A community-backed design for the Presidio Parkway was chosen in 2009 after years of intensive regional coordination, environmental review, and interagency planning. The project was carefully designed to withstand the maximum considered earthquake for the region, improve traffic safety, and improve access to the Presidio and Golden Gate National Recreation Area. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
