Pressed Cafe BBEC Conversion
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work performed under this contract will consist of furnishing all labor, materials, and equipment necessary to provide interior modifications to Pressed Caf at the Bay Breeze Events Center at Keesler AFB, MS as specified in the Statement of Work, Specifications, and as shown in the drawings.
- Status
- Prospective
- Sector
- Consumer Products, Commercial, Raw Materials
- Location
- Biloxi, Mississippi, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pressed Cafe BBEC Conversion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The work performed under this contract will consist of furnishing all labor, materials, and equipment necessary to provide interior modifications to Pressed Caf at the Bay Breeze Events Center at Keesler AFB, MS as specified in the Statement of Work, Specifications, and as shown in the drawings. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Biloxi |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Commercial, Raw Materials |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
